2019 Street Reclamation Project

**THIRD STREET CONCEPT PLANS**

City Council Approved Third Street Concept - March 5, 2019

INTRODUCTION

The 2019 Street Reclamation Project includes:

•           Blue Stem Court
•           Covey Court
•           Eklund Court
•           Grundhoefer Court
•           Hackerson Court
•           Kimble Court
•           Nelson Court
•           Simione Court
•           Wilson Court
•           Zanmiller Drive from Meldahl Lane to Gill Lane
•           Gill Lane from Zanmiller Drive to Lockwood Drive
•           Lockwood Drive from Meldahl Lane to Gill Lane
•           Orchard Street from Third Street to Fifth Street
•           Plum Street from Third Street to Fifth Street
•           Poplar Street from Fourth Street to Fifth Street
•           Forest Avenue from Lincoln Street to Fifth Street
•           Forest Avenue Loop
•           Third Street from RR Tracks to Forest Avenue
•           Fourth Street from Odd Fellows Lane to Poplar Street

2019 Sidewalk Gaps


The process began with the Northfield City Council ordering a Feasibility Study on October 16, 2018. The Feasibility Study examines the proposed street and utility improvements along these street corridors to determine whether the project – as proposed – is feasible, cost effective and necessary.

The entire project area will receive a full depth reclaim (up to 12”), which means the asphalt will be ground up and mixed with the underlying gravel base to establish a new base for new asphalt. This reclaimed material will then be reshaped and recompacted in order to receive 4” of new asphalt pavement. Minor spot repairs on utilities, curb and gutter removal and replacement, and tree removals will be completed as necessary.  Sidewalk gaps will be evaluated during the feasibility report, and new sidewalk installations will be proposed along the project corridor.

PROJECT PROCESS

The process for developing the special assessments for properties along the project corridor follows Minnesota State Statute Chapter 429-Local Improvements, Special Assessments. The Project Process steps are typically completed to take advantage of a positive bonding environment and to make full use of the construction season.

PROJECT MEETINGS AND UPDATES

12/12/18 - (5:30 - 7:00 p.m.) - Neighborhood Meeting #1, City Hall Council Chambers, 801 Washington Street - Meeting Notice, General Information Boards, Project Location Maps, Reclaim Brochure, Neighborhood Meeting Presentation

1/8/19 - (6:00 - 8:00 p.m.) - Improvement Hearing, City Hall Council Chambers, 801 Washington Street 

1/22/19 - (6:00 - 8:00 p.m.) - Order Improvement and Preparation of Plans and Specifications, City Hall Council Chambers

2/4/19 - (5:30 - 7:00 p.m.) - Third Street Corridor Community Meeting, City Hall Council Chambers Press Release

3/5/19 - (6:00 - 8:00 p.m.) - Consider Approving Concepts for the 2019 Street Reclamation Project - Third Street, City Hall Council Chambers, 801 Washington Street

NEWSLETTERS

MAPS/PLANS/FILES

Feasibility Report - 12-7-18
City Council Approved Third Street Concept - 3/5/19